Take a tour of the progress at the Yale Science Building (YSB).
Photos by Joseph Wolenski.
-
400 Ton crane
-
400 Ton crane
-
Ground floor, Titan Krios Cryo EM pits
-
Ground floor, Titan Krios Cryo EM pits
-
Confocal microscopy suites
-
Confocal microscopy suites
-
Confocal microscopy suites
-
Confocal microscopy suites
-
Library steps
-
Library steps
-
480 seat auditorium
-
480 seat auditorium
-
480 seat auditorium
-
480 seat auditorium
-
480 seat auditorium
-
480 seat auditorium
-
480 seat auditorium
-
Concourse floor offices
-
Concourse floor offices
-
Signed I beam
-
Constructions worker
-
A view through the top of the building
-
Signed I beam
-
Signed I beam
-
Signed I beam
-
Signed I beam
-
Heating and cooling duct
-
Heating and cooling duct
-
Heating and cooling duct
-
Heating and cooling duct
-
Greenhouse foundations
-
Greenhouse foundations
-
Greenhouse foundations
-
Greenhouse
-
Energy recovery units
-
Energy recovery units
-
Chemical hood exhaust ducts
-
Chemical hood exhaust ducts
-
KBT Cafe and pavilion
-
KBT Cafe and pavilion
-
American Flag over the work site
-
KBT Cafe and pavilion
-
KBT Cafe and pavilion
-
Office space
-
Office space
-
Office space
-
Ground level
-
Construction worker
-
Ground level
-
Ground level
-
Ground level
-
Ground level
-
Constructions worker
-
Concrete crew
-
Concrete crew
-
Ground level - outside
-
Carpenter crew
-
Carpenter crew
July 17, 2018